
ARCHITECTURE
PORTFOLIO
HANS HOSEA GONZA
PROJECT 1
In this project we are expected to demonstrate our understanding of building services by proposing and designing the most appropriate systems for the building which include:
i) electrical supply system
ii) cold water and hot water supply system
iii) sewerage and sanitary system
iv) drainage system.
We were therefore required to produce appropriate drawings and diagrams which include specifications, symbols, legends, images, etc. to describe the installation of all the building services. Additionally, specific clauses in the Uniform Building By-Law (UBBL) which relate to the proposed systems were also to be cited.
.
BUILDING SERIVICES
APPLICATION OF BUILDING SERVICES
Case Study, Analysis and Documentation of Building Services Systems
PROJECT 2
PROJECT REPORT







This project was undertaken in a group of 6 people. Under the tutelage of a lecturer, each group is required to choose a building of at least 4-storey high which can be either public or commercial buildings (i.e. office blocks, institutional buildings, shopping malls, etc.). Each group is to perform a thorough study and analysis of the following services systems associated to the building; i) mechanical ventilation and air-conditioning system, ii) electrical supply system, iii) water supply system, iv) sewerage and sanitary system, v) mechanical transportation system as well as vi) fire protection system and document their findings accordingly. The purpose of this assignment is to give a clearer picture of what the students have learnt in the classroom and to evaluate their understanding on the systems that they have observed